Processing nearly 40,000 tons of waste per day

27

27 waste-to-energy EPC projects, including 11 projects outside the company

58

58 incineration lines, representing the overall scale of waste-to-energy EPC projects

(Note: The above data is as of December 2023)
Industry-leading EPC capability
Equipment Integration Capability

Possessing the world's leading independent research and development technology for core equipment, ensuring top-notch integration capabilities

Engineering Capability
Our expertise spans the entire spectrum of "R&D, investment, construction, and Operation" providing comprehensive design consulting and turnkey services throughout the entire process
Project Management Capability
High-end refined project management and control in China to ensure successful project execution from start to finish
Classic Cases
Second Largest Waste-to-Energy Plant in Asia
Hangzhou Linjiang Environmental Energy Project (EPC+O Mode)

Client: Hangzhou Linjiang Environmental Energy Co., Ltd.

Operator: Zhejiang Kangjiang Environment (a wholly-owned subsidiary of SUS)

Super-large capacity: 5,220 t/d (6*870 t/d)

Flue gas purification adopts the currently internationally advanced three-step deacidification and double denitrification combined process design including "SNCR + rotating spray semi-dry method + dry deacidification + activated carbon jet adsorption+ bag filter+1#GGH+wet deacidification+SGH+SCR+2#GGH."

The design of the project features a post-industrial style, blending the delicate and ethereal qualities of silk ribbon to enhance the building's allure. This design philosophy fosters a feeling of simplicity, offering a natural and authentic aesthetic experience.

Welcome to Follow our Wechat Official Account

Scan the QR-Code to Follow our WeChat Official

Account to Get the Latest News