Zhuhai Project
Southern Region - Guangdong Zhuhai City - Zhuhai Project

Project address:Zhuhai Xinhuan Environmental Protection Co., Ltd., No. 2 Zhushan North Road, Doumen Town, Doumen District, Zhuhai City. Zhuhai Kangheng Environmental Protection Co., Ltd., No. 1 Zhushan North Road, Doumen Town, Doumen District, Zhuhai City

Appointment visit contact phone number:+86 0756-6995108-8505

The first and second phases of the Zhuhai Environmental Biomass Thermal Power Project are located in the Zhuhai Ecological and Environmental Protection Industrial Park of the Fushan Industrial Park in Zhuhai, responsible for the "reduction, resource utilization, and harmless" treatment of domestic waste throughout the city. The first phase of the project has a domestic waste treatment capacity of 1200 tons per day. Construction began in August 2015 and was put into operation in November 2016; The second phase of the project has a domestic waste treatment capacity of 1800 tons per day. Construction began in March 2019 and was put into operation in May 2020.

The Zhuhai Environmental Biomass Thermal Power Project is the first project of the Zhuhai Ecological and Environmental Protection Industrial Park, a key project of Zhuhai City, highly valued by the Zhuhai Municipal Party Committee and Government. At the same time, as a "Guangdong Province Environmental Education Base" and "Zhuhai City Research and Practice Education Base", it undertakes the social responsibility of environmental science popularization education in Zhuhai City.

Project reality


Project highlights

1、Fresh and elegant "deindustrialization" design

The exterior of the factory building was designed by the famous French company AIA, adopting a de industrial design concept, fully utilizing the transparency and breathability characteristics of frosted U-shaped glass, supplemented by the ordered beauty of heavy bamboo grilles. While maintaining overall coordination of the building, it highlights the lightness and transparency of the local area, creating a unique artistic temperament.



2、Scientific planning and high-quality construction

The project is planned to build a waste incineration power generation as the core of the waste synergistic treatment facility that can satisfy the 3 million population of Zhuhai City in 2025, of which the construction of the first phase of the project (1,200 tons/day) took only 15 months, and the construction of the second phase of the project (1,800 tons/day) took only 14 months, and the acceptance rate of all the acceptance reaches 100%, and the waste transportation ramps and leachate treatment facilities that can be used for the third phase of the project (2,000 tons/day) are planned to be constructed. Transportation ramps and leachate treatment facilities have been planned and built for the third phase (2,000 tons/day), realizing the rational use of resources and efficient synergy in the park.

3、Ultra high smoke emission standards

Adopting domestic advanced flue gas purification process, the project's flue gas emission standard is better than the national standard (GB18485-2014) and the EU standard (2010/75/EU).

4、Open Neighborhood Community Co construction

The project is open for free, and residents can enter the factory to learn about the real-time operation of the project. At the same time, a community compensation mechanism will be established to provide free fitness and sports venues for surrounding residents. A volunteer team will be established to regularly carry out joint construction and condolence activities, turning avoiding neighbors into benefits.

1、Fresh and elegant "deindustrialization" design

The exterior of the factory building was designed by the famous French company AIA, adopting a de industrial design concept, fully utilizing the transparency and breathability characteristics of frosted U-shaped glass, supplemented by the ordered beauty of heavy bamboo grilles. While maintaining overall coordination of the building, it highlights the lightness and transparency of the local area, creating a unique artistic temperament.



2、Scientific planning and high-quality construction

The project is planned to build a waste incineration power generation as the core of the waste synergistic treatment facility that can satisfy the 3 million population of Zhuhai City in 2025, of which the construction of the first phase of the project (1,200 tons/day) took only 15 months, and the construction of the second phase of the project (1,800 tons/day) took only 14 months, and the acceptance rate of all the acceptance reaches 100%, and the waste transportation ramps and leachate treatment facilities that can be used for the third phase of the project (2,000 tons/day) are planned to be constructed. Transportation ramps and leachate treatment facilities have been planned and built for the third phase (2,000 tons/day), realizing the rational use of resources and efficient synergy in the park.

3、Ultra high smoke emission standards

Adopting domestic advanced flue gas purification process, the project's flue gas emission standard is better than the national standard (GB18485-2014) and the EU standard (2010/75/EU).

4、Open Neighborhood Community Co construction

The project is open for free, and residents can enter the factory to learn about the real-time operation of the project. At the same time, a community compensation mechanism will be established to provide free fitness and sports venues for surrounding residents. A volunteer team will be established to regularly carry out joint construction and condolence activities, turning avoiding neighbors into benefits.